9) The time required for one complete cut on a piece of work 350 mm long and 50 mm in diameter with cutting speed 35 m/min and the feed 0.5 mm/rev is
Answer is:
3.14 min
Related KPSC ITI JTO Turner Question Papers - 2018 with Answer Key
Answer is:
50
Answer is:
breakdown maintenance
Answer is: